Tiong Seng has successfully achieve more than the set target of 100m a day of DfMA modular lead-in pipes installation.
The total length spans 2200m and 950m has been installed within 7 working days (as of 17 July 2022) with a team configuration of 3 personnel, including an excavator operator and lifting supervisor.
Comments